Link Site Progress Item with Purchase Order
C
Cargnelutti Tomas
I would like to suggest adding a feature to link each Site Progress Item with the corresponding Purchase Order (PO No/Item). Currently, there is no direct connection between the Site Progress Item and the order, which often represents an activity assigned to a supplier through a specific order for services.
By having the PO reference directly on the Site Progress Item, it would allow immediate tracking of the order associated with the activity, avoiding additional steps or manual searches. This would also clearly link the activity to the supplier responsible for performing it, improving monitoring, control, and overall process transparency.
Log In
H
Humer Raphael
Hello Tomas,
I like this idea of linking Planned Material with the Site Progress!
For us it would also be interesting to link the time schedule and site progress with the Bill of Material. This would allow us to check if the planned delivery dates match with the installation plan.