Feature Requests
Please vote and comment on feedback that you would like to see implemented. If you would like to contribute a feature not available here, please describe your feedback and send it to
support@insite-lms.com
Showing
Planned For Next Release
Sort
Trending
Top
New
Filter
Under Review
Planned For Next Release
In Progress
Developed (for 10.2)
posts in
All Categories
All Categories
General (87)
Desktop Client (12)
Customizing (20)
Time App (2)
Mobile App (13)
Web Client (1)
Dashboards (7)
Interfaces (13)
Import (15)
Report (9)
Daily Logs: Notifications to specific people
Our construction site colleagues would like the ability to send notifications to specific individuals within the Daily Logs. These logs document the current status of the construction site and often contain information relevant to the Project Manager or Team Leader. Currently, affected individuals are not informed when a new entry is created or an existing entry is supplemented or changed. Implementing this feature would ensure that relevant parties are promptly notified of updates.
2
·
General
·
planned for next release
7
New Module: Time Booking Calendar
The current Workday Calendar is nice, but only allows to record attendance per day. Our process requires our supervisors to enter their timesheet entries directly with the site progress item (time booking) associated. So the current two step process (attendance + time booking) becomes impossible for our supervisors to follow. Thus we propose a new Time Booking Calendar module, which looks similar to the Work Day Calendar with the following functionality: Select an employee Select the Site Progress Items, which should be shown as rows Allow the user to enter hours per day per Site Progress Item Automatically create the Work Days and Time Bookings in one step
1
·
General
·
planned for next release
5
Link Multiple Items to a Single Task
I would like the ability to create a single task that can be linked to multiple items. Currently, it seems that each task can only be associated with one item, which limits flexibility and efficiency in managing related tasks and items.
1
·
General
·
planned for next release
12
Include Failed Imports in Import History
We need a way to track failed imports in the Import History. Currently, only successful imports are visible, and failed imports are not recorded, especially for manual imports. This makes it difficult for time-responsible personnel uploading time bookings from external systems to verify if the import was successful and to identify any errors, such as incorrect UserIDs or unregistered users.
2
·
Interfaces
·
planned for next release
7
S-Curve with Work Hours
Add the possibility to show S-Curves for hours in Site Progress. It would be helpful to have Booked Hours and Planned Hours visually available . Things to consider: Should the information be included in the existing S-Curve or should a new widget be developed, just for hours information? Settings to enable/disable every line? Planned Hours based on Planned Dates and Baseline Planned Dates? Planned Hours shoud consider linear and normal distribution, based on Project Setup Correctly consider project setting "Precision" (Days or Hours)
4
·
General
·
planned for next release
11